INGECID has extensive experience in civil engineering projects carried out under the BIM methodology.

Specifically, one of the projects where BIM was implemented throughout all construction phases was the infrastructure construction for Sections 9A and 9B of Phase I of the Bilbao South Metropolitan Bypass. BIM played a key role in coordinating between disciplines and sections, facilitating communication among stakeholders, and supporting 3D BIM modeling and 4D scheduling for alternatives analysis. This was made possible using a collaborative environment (CDE) supported by the comprehensive project management platform VIRCORE, which allowed for the development of an integrated model containing all project documentation.

The application of BIM methodology in this project enabled the team to identify and effectively resolve current challenges in managing large-scale BIM projects in a practical and efficient manner.

YOUR NEXT BIG PROJECT STARTS HERE

/ Let’s discuss how our solutions can help you achieve your goals.

/ Extensive experience across multiple sectors

OTHER PROJECTS

  • BIM
    Digital transformation in electrical infrastructure: BIM implementation in substations and extra-high voltage lines
  • BIM
    Assistance with the implementation of the BIM methodology for the Army Logistics Base (BLET) project
  • BIM
    Implementation of BIM methodology at AENA