{"id":5303,"date":"2020-03-26T08:02:17","date_gmt":"2020-03-26T08:02:17","guid":{"rendered":"https:\/\/ingecid.com\/?p=5303"},"modified":"2025-05-29T10:39:51","modified_gmt":"2025-05-29T10:39:51","slug":"enresa-adjudica-la-ingenieria-del-licenciamiento-del-almacen-para-combustible-gastado-de-la-central-nuclear-de-santa-maria-de-garona-a-la-ute-ingecid-westinghouse","status":"publish","type":"post","link":"https:\/\/ingecid.com\/en\/enresa-adjudica-la-ingenieria-del-licenciamiento-del-almacen-para-combustible-gastado-de-la-central-nuclear-de-santa-maria-de-garona-a-la-ute-ingecid-westinghouse\/","title":{"rendered":"ENRESA awards the engineering contract for licensing the spent fuel storage facility at the Santa Mar\u00eda de Garo\u00f1a nuclear power plant to the INGECID-WESTINGHOUSE joint venture"},"content":{"rendered":"<p style=\"text-align: justify;\" class=\"translation-block\">ENRESA, the national radioactive waste company, has awarded a contract for the \"Engineering service for the design modification of the Individualized Temporary Storage facility at the Santa Mar\u00eda de Garo\u00f1a nuclear power plant\" to the joint venture formed by INGECID and WESTINGHOUSE, as announced on February 14, 2020.<\/p>\n<p style=\"text-align: justify;\" class=\"translation-block\">The contract, signed on March 16, 2020, is for a total of more than half a million euros. The modification to the design of the temporary storage facility will increase its capacity to allow the temporary storage of all the fuel currently stored in its pool, so that work on decommissioning the plant can be carried out. The temporary storage facility must also have sufficient capacity to accommodate the special operational waste currently in the pool and waste from decommissioning.<\/p>\n<p style=\"text-align: justify;\">Official license documentation for the modification of the storage facility\u2019s design will be prepared. It will be submitted with the application for authorization of the decommissioning of the plant, and to subsequently support the request for a license from the Nuclear Safety Council (CSN). Support studies in different disciplines (structural, thermal, radiological, etc.) will be necessary and these will be the basis for the justification of the changes in the design of the facility.<\/p>","protected":false},"excerpt":{"rendered":"<p>La Empresa Nacional de Residuos Radiactivos (ENRESA) ha adjudicado el  [&#8230;]<\/p>\n","protected":false},"author":2,"featured_media":5304,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-5303","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>ENRESA adjudica la Ingenier\u00eda del licenciamiento del Almac\u00e9n para combustible gastado de la Central Nuclear de Santa Mar\u00eda de Garo\u00f1a a la UTE INGECID-WESTINGHOUSE - Ingecid<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ingecid.com\/en\/enresa-adjudica-la-ingenieria-del-licenciamiento-del-almacen-para-combustible-gastado-de-la-central-nuclear-de-santa-maria-de-garona-a-la-ute-ingecid-westinghouse\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ENRESA adjudica la Ingenier\u00eda del licenciamiento del Almac\u00e9n para combustible gastado de la Central Nuclear de Santa Mar\u00eda de Garo\u00f1a a la UTE INGECID-WESTINGHOUSE - Ingecid\" \/>\n<meta property=\"og:description\" content=\"La Empresa Nacional de Residuos Radiactivos (ENRESA) ha adjudicado el [...]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ingecid.com\/en\/enresa-adjudica-la-ingenieria-del-licenciamiento-del-almacen-para-combustible-gastado-de-la-central-nuclear-de-santa-maria-de-garona-a-la-ute-ingecid-westinghouse\/\" \/>\n<meta property=\"og:site_name\" content=\"Ingecid\" \/>\n<meta property=\"article:published_time\" content=\"2020-03-26T08:02:17+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-05-29T10:39:51+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/ingecid.com\/wp-content\/uploads\/2025\/05\/i1-11.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"512\" \/>\n\t<meta property=\"og:image:height\" content=\"288\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Ingecid\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ingecid\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/ingecid.com\\\/enresa-adjudica-la-ingenieria-del-licenciamiento-del-almacen-para-combustible-gastado-de-la-central-nuclear-de-santa-maria-de-garona-a-la-ute-ingecid-westinghouse\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ingecid.com\\\/enresa-adjudica-la-ingenieria-del-licenciamiento-del-almacen-para-combustible-gastado-de-la-central-nuclear-de-santa-maria-de-garona-a-la-ute-ingecid-westinghouse\\\/\"},\"author\":{\"name\":\"Ingecid\",\"@id\":\"https:\\\/\\\/ingecid.com\\\/#\\\/schema\\\/person\\\/4645e1ebf190c29757c95e91b77d1ebf\"},\"headline\":\"ENRESA adjudica la Ingenier\u00eda del licenciamiento del Almac\u00e9n para combustible gastado de la Central Nuclear de Santa Mar\u00eda de Garo\u00f1a a la UTE INGECID-WESTINGHOUSE\",\"datePublished\":\"2020-03-26T08:02:17+00:00\",\"dateModified\":\"2025-05-29T10:39:51+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/ingecid.com\\\/enresa-adjudica-la-ingenieria-del-licenciamiento-del-almacen-para-combustible-gastado-de-la-central-nuclear-de-santa-maria-de-garona-a-la-ute-ingecid-westinghouse\\\/\"},\"wordCount\":269,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/ingecid.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/ingecid.com\\\/enresa-adjudica-la-ingenieria-del-licenciamiento-del-almacen-para-combustible-gastado-de-la-central-nuclear-de-santa-maria-de-garona-a-la-ute-ingecid-westinghouse\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ingecid.com\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/i1-11.jpg\",\"articleSection\":[\"Noticias\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/ingecid.com\\\/enresa-adjudica-la-ingenieria-del-licenciamiento-del-almacen-para-combustible-gastado-de-la-central-nuclear-de-santa-maria-de-garona-a-la-ute-ingecid-westinghouse\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/ingecid.com\\\/enresa-adjudica-la-ingenieria-del-licenciamiento-del-almacen-para-combustible-gastado-de-la-central-nuclear-de-santa-maria-de-garona-a-la-ute-ingecid-westinghouse\\\/\",\"url\":\"https:\\\/\\\/ingecid.com\\\/enresa-adjudica-la-ingenieria-del-licenciamiento-del-almacen-para-combustible-gastado-de-la-central-nuclear-de-santa-maria-de-garona-a-la-ute-ingecid-westinghouse\\\/\",\"name\":\"ENRESA adjudica la Ingenier\u00eda del licenciamiento del Almac\u00e9n para combustible gastado de la Central Nuclear de Santa Mar\u00eda de Garo\u00f1a a la UTE INGECID-WESTINGHOUSE - Ingecid\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ingecid.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/ingecid.com\\\/enresa-adjudica-la-ingenieria-del-licenciamiento-del-almacen-para-combustible-gastado-de-la-central-nuclear-de-santa-maria-de-garona-a-la-ute-ingecid-westinghouse\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/ingecid.com\\\/enresa-adjudica-la-ingenieria-del-licenciamiento-del-almacen-para-combustible-gastado-de-la-central-nuclear-de-santa-maria-de-garona-a-la-ute-ingecid-westinghouse\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ingecid.com\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/i1-11.jpg\",\"datePublished\":\"2020-03-26T08:02:17+00:00\",\"dateModified\":\"2025-05-29T10:39:51+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/ingecid.com\\\/enresa-adjudica-la-ingenieria-del-licenciamiento-del-almacen-para-combustible-gastado-de-la-central-nuclear-de-santa-maria-de-garona-a-la-ute-ingecid-westinghouse\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/ingecid.com\\\/enresa-adjudica-la-ingenieria-del-licenciamiento-del-almacen-para-combustible-gastado-de-la-central-nuclear-de-santa-maria-de-garona-a-la-ute-ingecid-westinghouse\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ingecid.com\\\/enresa-adjudica-la-ingenieria-del-licenciamiento-del-almacen-para-combustible-gastado-de-la-central-nuclear-de-santa-maria-de-garona-a-la-ute-ingecid-westinghouse\\\/#primaryimage\",\"url\":\"https:\\\/\\\/ingecid.com\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/i1-11.jpg\",\"contentUrl\":\"https:\\\/\\\/ingecid.com\\\/wp-content\\\/uploads\\\/2025\\\/05\\\/i1-11.jpg\",\"width\":512,\"height\":288},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/ingecid.com\\\/enresa-adjudica-la-ingenieria-del-licenciamiento-del-almacen-para-combustible-gastado-de-la-central-nuclear-de-santa-maria-de-garona-a-la-ute-ingecid-westinghouse\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/ingecid.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ENRESA adjudica la Ingenier\u00eda del licenciamiento del Almac\u00e9n para combustible gastado de la Central Nuclear de Santa Mar\u00eda de Garo\u00f1a a la UTE INGECID-WESTINGHOUSE\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/ingecid.com\\\/#website\",\"url\":\"https:\\\/\\\/ingecid.com\\\/\",\"name\":\"Ingecid\",\"description\":\"Ingenier&iacute;a y Transformaci&oacute;n Digital para Infraestructuras\",\"publisher\":{\"@id\":\"https:\\\/\\\/ingecid.com\\\/#organization\"},\"alternateName\":\"Ingecid\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/ingecid.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/ingecid.com\\\/#organization\",\"name\":\"Ingecid\",\"alternateName\":\"Ingecid | Ingenier\u00eda y Transformaci\u00f3n Digital para Infraestructuras\",\"url\":\"https:\\\/\\\/ingecid.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ingecid.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/ingecid.com\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/Isotipo_SVG_Azul_Amarillo.svg\",\"contentUrl\":\"https:\\\/\\\/ingecid.com\\\/wp-content\\\/uploads\\\/2025\\\/02\\\/Isotipo_SVG_Azul_Amarillo.svg\",\"width\":207,\"height\":317,\"caption\":\"Ingecid\"},\"image\":{\"@id\":\"https:\\\/\\\/ingecid.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/es.linkedin.com\\\/company\\\/ingecid\",\"https:\\\/\\\/www.youtube.com\\\/channel\\\/UC15XZLCFUDWQ8XtRntNk8sQ\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/ingecid.com\\\/#\\\/schema\\\/person\\\/4645e1ebf190c29757c95e91b77d1ebf\",\"name\":\"Ingecid\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4e8292499a927c7c8ed69a5296d745fb6f7532788f83dd86d66adaa710754b14?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4e8292499a927c7c8ed69a5296d745fb6f7532788f83dd86d66adaa710754b14?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4e8292499a927c7c8ed69a5296d745fb6f7532788f83dd86d66adaa710754b14?s=96&d=mm&r=g\",\"caption\":\"Ingecid\"},\"url\":\"https:\\\/\\\/ingecid.com\\\/en\\\/author\\\/ingecid\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"ENRESA adjudica la Ingenier\u00eda del licenciamiento del Almac\u00e9n para combustible gastado de la Central Nuclear de Santa Mar\u00eda de Garo\u00f1a a la UTE INGECID-WESTINGHOUSE - Ingecid","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ingecid.com\/en\/enresa-adjudica-la-ingenieria-del-licenciamiento-del-almacen-para-combustible-gastado-de-la-central-nuclear-de-santa-maria-de-garona-a-la-ute-ingecid-westinghouse\/","og_locale":"en_US","og_type":"article","og_title":"ENRESA adjudica la Ingenier\u00eda del licenciamiento del Almac\u00e9n para combustible gastado de la Central Nuclear de Santa Mar\u00eda de Garo\u00f1a a la UTE INGECID-WESTINGHOUSE - Ingecid","og_description":"La Empresa Nacional de Residuos Radiactivos (ENRESA) ha adjudicado el [...]","og_url":"https:\/\/ingecid.com\/en\/enresa-adjudica-la-ingenieria-del-licenciamiento-del-almacen-para-combustible-gastado-de-la-central-nuclear-de-santa-maria-de-garona-a-la-ute-ingecid-westinghouse\/","og_site_name":"Ingecid","article_published_time":"2020-03-26T08:02:17+00:00","article_modified_time":"2025-05-29T10:39:51+00:00","og_image":[{"width":512,"height":288,"url":"https:\/\/ingecid.com\/wp-content\/uploads\/2025\/05\/i1-11.jpg","type":"image\/jpeg"}],"author":"Ingecid","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Ingecid","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/ingecid.com\/enresa-adjudica-la-ingenieria-del-licenciamiento-del-almacen-para-combustible-gastado-de-la-central-nuclear-de-santa-maria-de-garona-a-la-ute-ingecid-westinghouse\/#article","isPartOf":{"@id":"https:\/\/ingecid.com\/enresa-adjudica-la-ingenieria-del-licenciamiento-del-almacen-para-combustible-gastado-de-la-central-nuclear-de-santa-maria-de-garona-a-la-ute-ingecid-westinghouse\/"},"author":{"name":"Ingecid","@id":"https:\/\/ingecid.com\/#\/schema\/person\/4645e1ebf190c29757c95e91b77d1ebf"},"headline":"ENRESA adjudica la Ingenier\u00eda del licenciamiento del Almac\u00e9n para combustible gastado de la Central Nuclear de Santa Mar\u00eda de Garo\u00f1a a la UTE INGECID-WESTINGHOUSE","datePublished":"2020-03-26T08:02:17+00:00","dateModified":"2025-05-29T10:39:51+00:00","mainEntityOfPage":{"@id":"https:\/\/ingecid.com\/enresa-adjudica-la-ingenieria-del-licenciamiento-del-almacen-para-combustible-gastado-de-la-central-nuclear-de-santa-maria-de-garona-a-la-ute-ingecid-westinghouse\/"},"wordCount":269,"commentCount":0,"publisher":{"@id":"https:\/\/ingecid.com\/#organization"},"image":{"@id":"https:\/\/ingecid.com\/enresa-adjudica-la-ingenieria-del-licenciamiento-del-almacen-para-combustible-gastado-de-la-central-nuclear-de-santa-maria-de-garona-a-la-ute-ingecid-westinghouse\/#primaryimage"},"thumbnailUrl":"https:\/\/ingecid.com\/wp-content\/uploads\/2025\/05\/i1-11.jpg","articleSection":["Noticias"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/ingecid.com\/enresa-adjudica-la-ingenieria-del-licenciamiento-del-almacen-para-combustible-gastado-de-la-central-nuclear-de-santa-maria-de-garona-a-la-ute-ingecid-westinghouse\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/ingecid.com\/enresa-adjudica-la-ingenieria-del-licenciamiento-del-almacen-para-combustible-gastado-de-la-central-nuclear-de-santa-maria-de-garona-a-la-ute-ingecid-westinghouse\/","url":"https:\/\/ingecid.com\/enresa-adjudica-la-ingenieria-del-licenciamiento-del-almacen-para-combustible-gastado-de-la-central-nuclear-de-santa-maria-de-garona-a-la-ute-ingecid-westinghouse\/","name":"ENRESA adjudica la Ingenier\u00eda del licenciamiento del Almac\u00e9n para combustible gastado de la Central Nuclear de Santa Mar\u00eda de Garo\u00f1a a la UTE INGECID-WESTINGHOUSE - Ingecid","isPartOf":{"@id":"https:\/\/ingecid.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ingecid.com\/enresa-adjudica-la-ingenieria-del-licenciamiento-del-almacen-para-combustible-gastado-de-la-central-nuclear-de-santa-maria-de-garona-a-la-ute-ingecid-westinghouse\/#primaryimage"},"image":{"@id":"https:\/\/ingecid.com\/enresa-adjudica-la-ingenieria-del-licenciamiento-del-almacen-para-combustible-gastado-de-la-central-nuclear-de-santa-maria-de-garona-a-la-ute-ingecid-westinghouse\/#primaryimage"},"thumbnailUrl":"https:\/\/ingecid.com\/wp-content\/uploads\/2025\/05\/i1-11.jpg","datePublished":"2020-03-26T08:02:17+00:00","dateModified":"2025-05-29T10:39:51+00:00","breadcrumb":{"@id":"https:\/\/ingecid.com\/enresa-adjudica-la-ingenieria-del-licenciamiento-del-almacen-para-combustible-gastado-de-la-central-nuclear-de-santa-maria-de-garona-a-la-ute-ingecid-westinghouse\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ingecid.com\/enresa-adjudica-la-ingenieria-del-licenciamiento-del-almacen-para-combustible-gastado-de-la-central-nuclear-de-santa-maria-de-garona-a-la-ute-ingecid-westinghouse\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ingecid.com\/enresa-adjudica-la-ingenieria-del-licenciamiento-del-almacen-para-combustible-gastado-de-la-central-nuclear-de-santa-maria-de-garona-a-la-ute-ingecid-westinghouse\/#primaryimage","url":"https:\/\/ingecid.com\/wp-content\/uploads\/2025\/05\/i1-11.jpg","contentUrl":"https:\/\/ingecid.com\/wp-content\/uploads\/2025\/05\/i1-11.jpg","width":512,"height":288},{"@type":"BreadcrumbList","@id":"https:\/\/ingecid.com\/enresa-adjudica-la-ingenieria-del-licenciamiento-del-almacen-para-combustible-gastado-de-la-central-nuclear-de-santa-maria-de-garona-a-la-ute-ingecid-westinghouse\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/ingecid.com\/"},{"@type":"ListItem","position":2,"name":"ENRESA adjudica la Ingenier\u00eda del licenciamiento del Almac\u00e9n para combustible gastado de la Central Nuclear de Santa Mar\u00eda de Garo\u00f1a a la UTE INGECID-WESTINGHOUSE"}]},{"@type":"WebSite","@id":"https:\/\/ingecid.com\/#website","url":"https:\/\/ingecid.com\/","name":"Ingecid","description":"Ingenier&iacute;a y Transformaci&oacute;n Digital para Infraestructuras","publisher":{"@id":"https:\/\/ingecid.com\/#organization"},"alternateName":"Ingecid","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ingecid.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/ingecid.com\/#organization","name":"Ingecid","alternateName":"Ingecid | Ingenier\u00eda y Transformaci\u00f3n Digital para Infraestructuras","url":"https:\/\/ingecid.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ingecid.com\/#\/schema\/logo\/image\/","url":"https:\/\/ingecid.com\/wp-content\/uploads\/2025\/02\/Isotipo_SVG_Azul_Amarillo.svg","contentUrl":"https:\/\/ingecid.com\/wp-content\/uploads\/2025\/02\/Isotipo_SVG_Azul_Amarillo.svg","width":207,"height":317,"caption":"Ingecid"},"image":{"@id":"https:\/\/ingecid.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/es.linkedin.com\/company\/ingecid","https:\/\/www.youtube.com\/channel\/UC15XZLCFUDWQ8XtRntNk8sQ"]},{"@type":"Person","@id":"https:\/\/ingecid.com\/#\/schema\/person\/4645e1ebf190c29757c95e91b77d1ebf","name":"Ingecid","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/4e8292499a927c7c8ed69a5296d745fb6f7532788f83dd86d66adaa710754b14?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/4e8292499a927c7c8ed69a5296d745fb6f7532788f83dd86d66adaa710754b14?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/4e8292499a927c7c8ed69a5296d745fb6f7532788f83dd86d66adaa710754b14?s=96&d=mm&r=g","caption":"Ingecid"},"url":"https:\/\/ingecid.com\/en\/author\/ingecid\/"}]}},"_links":{"self":[{"href":"https:\/\/ingecid.com\/en\/wp-json\/wp\/v2\/posts\/5303","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ingecid.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ingecid.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ingecid.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/ingecid.com\/en\/wp-json\/wp\/v2\/comments?post=5303"}],"version-history":[{"count":1,"href":"https:\/\/ingecid.com\/en\/wp-json\/wp\/v2\/posts\/5303\/revisions"}],"predecessor-version":[{"id":5305,"href":"https:\/\/ingecid.com\/en\/wp-json\/wp\/v2\/posts\/5303\/revisions\/5305"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ingecid.com\/en\/wp-json\/wp\/v2\/media\/5304"}],"wp:attachment":[{"href":"https:\/\/ingecid.com\/en\/wp-json\/wp\/v2\/media?parent=5303"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ingecid.com\/en\/wp-json\/wp\/v2\/categories?post=5303"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ingecid.com\/en\/wp-json\/wp\/v2\/tags?post=5303"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}