Alisos Foundations
Development of detailed engineering of foundations for 2 MW wind turbines at the Alisios wind farm, Fuerteventura, Canary Islands.
Design and development of detailed engineering of solid circular reinforced concrete foundations.
The Alisios wind farm has five 90-meter high wind turbines in Morro del Cuchillo Negro, Fuerteventura. INGECID has designed and developed the detailed engineering of the solid circular reinforced concrete foundations for the five 2 MW wind turbines of the Canary Islands wind farm. For this purpose, the analysis of the geotechnical study for the different locations on the site was carried out using the software.
The construction of the farm, including the installation of the wind turbines, was completed in February 2018 and the farm became operational in May 2018.